SRGE.

Upgrades

Charge-air and auxiliary cooling

An upgraded radiator for the charge-air cooling circuit. Budget for coolant and installation separately.

Can improve temperature repeatability under sustained load when the relevant circuit is the bottleneck.

Check policy disclosure and keep required systems intact.

Open guide in SRGE

Sources